The latest on Move.
Because we have been sunked into piles of certification papers for the last weeks we haven't had that much interesting to share, that's why there haven't been that many updates.
We have now however done all we can at the moment with certification and have some interesting to show you!
The added buttons meant for us that we needed to make changes to all production files and the adding of buttons also made the plastic injection mould more complex and expensive to build. We made the calculations before telling you all that we should make buttons and we are pretty happy with how they turned out and hope you all also will think so. One thing we did not anticipate however was that this also made the delivery time longer for the plastic injection molds, but at the moment we still believe we will be able to start ship units in February. The attached pictures is showing the latest design of MOVE. We have been forced to do a minor change to the design because of regulations. In order to to add more cover to the reel we made plastic parts on the lid that the user can break of in the direction where the line or bead chain is going to run. The pictures are also showing the two types of wall brackets that will be supplied (there will be two of each of the types supplied with every MOVE) and as you can see you will be able to use these in every direction when you mount MOVE, making them very versatile and enabling many different types of installations. -MOVE team